The old amenity block in Crawford Park (South of Money’s Creek) has been demolished and construction is well under way of the two new blocks as advised in a posting here on 9th March.
The new amenities block will consist of two separate structures joined by a common breezeway. Each building will house two separate toilets (four in total) together with disabled access, a vanity and a shower.